How can I set the level of plans loading?
To do this, you need:
go to the "Service Settings" page of the Data Console solution;
click on the field "Level of plans loading" in the block "Manage Data";
select the desired level from the proposed list in the pop-up panel;
click the "Apply" button.
go to the "Service Settings" page of the Data Console solution;
click on the field "Level of plans loading" in the block "Manage Data";
select the desired level from the proposed list in the pop-up panel;
click the "Apply" button.
Updated on: 02/05/2023
Thank you!